90- John “ our production is very good at the moment. According to the schedule he should have produced 100 units and he has already produced 120” His production is:
c)) ahead of schedule
a)) advanced
b)) in front of the schedule
Soluções para a tarefa
Respondido por
0
segunda opção advanced.
Perguntas interessantes